Shear Repair of Pedestrian Bridge Beams in Middle School
Due to high shear stresses in the supports of a pedestrian bridge, excessive cracking had begun to occur. The school district required the repair work to be completed rapidly over the Christmas break. FRP Construction repaired the bridge using glass FRP within three days at minimal cost and disturbance to the school.