Media Gallery

Shear Repair of Pedestrian Bridge Beams in Middle School

Due to high shear stresses in the supports of a pedestrian bridge, excessive cracking had begun to occur. The school district required the repair work to be completed rapidly over the Christmas break. FRP Construction repaired the bridge using glass FRP within three days at minimal cost and disturbance to the school.


FRP Construction
Underground Utility Tunnel Repair
FRP Construction
Seismic Retrofit of Historic Building
FRP Construction
Reinforced Concrete Columns in Tower
FRP Construction
Repair of Weather Damaged Silo
FRP Construction
Prestressed Beams in Parking Structure
FRP Construction
Column Repair in Extreme Conditions
FRP Construction
Slab Strengthening for New Construction
FRP Construction
Corrosion Damaged Piers Receive Repair
FRP Construction



FRP Construction
FRP Repair of Shear Frames/Walls